pisture pisture 

SH29 Cambridge Road Tauranga

This project on State Highway 29 / Cambridge Road in Tauranga completed in February 2014.
Thermoplastic Hot Pour TechGrip red high friction surfacing system. 294m2 completed in one shift.
Installed in 3 hours and ready for traffic within 20 minutes.

pisture

Welcome to Tek Services.

Road Surfacing & Repair Systems